New widget, price quote improvements, and new application settings options v2026.31.0

The prices of contractual items / project budget progress can be displayed as a main page widget in the system. In addition, in certain situations, it is quicker to use the quote building element, and the application sequence logics can be further customized.

Contract Item Prices Building Block Frontend Widget

  • New widget that displays the data of a contract item's prices building block
  • Due to its nature, the widget operates only in the top widget zone
  • In the settings of the building block, we can specify which application's cost/revenue/profit value to display on a daily basis
  • By default, the system displays the current week for all open application items, but both the date and the displayed application item (usually a project) are filterable
  • This widget is recommended for a manager who wants to review the profitability of a long-term project

 

Quotation Building Block

  • Bulk VAT modification can also be accessed by clicking on the VAT label in the table header
  • The client can provide feedback on a line-by-line basis for the online quotation sent to them, which we can see within the Fryda system.

 

Application Settings

  • Improved settings panel with minor adjustments
  • New variable options for developing the custom identification logic of the application